Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/allseasglobal.sndev.co.uk/httpdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/allseasglobal.sndev.co.uk/httpdocs/wp-includes/functions.php on line 6114
Allseas moves cranes across desert - Allseas Global

Allseas moves cranes across desert

25 October 2013

Allseas Global Logistics has organised the door-to-door shipment of five new internal gantry cranes from Scotland to Saudi Arabia for its client.

The consignments included the five cranes, which are capable of moving 380,000 tonnes per year when in full operation, and ten 35 m long girder sections, making up a total of 3,715 cu m.

A chartered vessel, OXL Avatar, was required to move the cargo from the UK to Saudi Arabia, before it was moved by truck across part of the Arabian desert to its final destination.
Allseas Global Logistics is a member of the Global Project Logistics Network (GPLN).

Author: Mark Binge, Group Commercial Manager

grantry

Also published on: Heavy Lift

 

Sign up to our newsletter

To receive bi-monthly industry updates, plus opinion and insights from our expert Logistics Consultants, sign up here.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.