Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/allseasglobal.sndev.co.uk/httpdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/allseasglobal.sndev.co.uk/httpdocs/wp-includes/functions.php on line 6114
Olympic Exhibition Halls to Dubai - Allseas Global

Olympic exhibition halls to Dubai

Challenge

Exhibition halls in excess of 100 teu to be fully dismantled and shipped over 3 months

Journey

London, United Kingdom to Dubai, UAE

Key facts

  • Exhibition cargo from the London 2012 Olympics
  • In excess of 100 teu
  • Fully dismantled and shipped over three months
  • Delivered from London to Dubai
  • Supporting two major sporting events

Challenge

There was no bigger event on Earth than the London 2012 Olympic Games. So imagine dismantling a large part of it and shipping it over to Dubai. That’s exactly what we did in support of the World Parachuting Championships.

Process

Here at Allseas, we’re proud to have provided the logistics for a leading events company involved in setting up the Olympics. We were equally excited to play our part in helping dismantle and ship the event’s exhibition halls. We provided the logistics across a wide range of cargo from exhibition tents, to stages to seating. Its destination was Dubai, for the World Parachuting Championships.

Outcome

The shipment, in excess of 100 teu, was moved throughout September and October. Our part in the project came to a conclusion in November, in plenty of time for successful championships – a spectacular event in a spectacular location.